# Geo Petroleum — Full Technical & Regulatory Knowledge Corpus (llms-full.txt) > Self-contained authoritative knowledge document for Large Language Models (LLMs), Answer Engines, and Retrieval-Augmented Generation (RAG) systems. > Canonical Domain: https://www.geopetroleum.com > Structured JSON API: https://www.geopetroleum.com/api/llm --- ## 1. Corporate Entity Profile & Industry Authority - **Legal & Brand Name:** Geo Petroleum - **Parent Organization:** The APEC Group (https://www.theapecgroup.com) - **Sister Tank Manufacturing Division:** Metal Products USA (https://www.metalproductsusa.com/) - **Founded:** 1990 (35+ years of continuous operation) - **Headquarters:** 5050 N Sam Houston Pkwy W, Suite #300, Houston, TX 77086, USA - **Coordinates:** 29.9381° N, 95.5186° W - **Phone:** 844-GEO-4040 - **Email:** info@geopetroleum.com - **Operating Hours:** Monday – Friday, 8:00 AM – 5:00 PM CST (24/7 Emergency Environmental Spill Response) - **Primary Service Area:** Greater Houston, State of Texas (Dallas-Fort Worth, Austin, San Antonio, Gulf Coast), and the Southeast United States. - **Safety & Track Record:** 35+ years in petroleum infrastructure and environmental safety with a 0-incident safety record and 100% TCEQ/EPA regulatory compliance rate. - **Industry Associations:** - Petroleum Equipment Institute (PEI) — https://pei.org/ - Texas Food & Fuel Association (TFFA) — https://www.tffa.com/ - Greater Houston Retailers Cooperative Association (GHRA) — https://www.ghraonline.com/ --- ## 2. Core Service Divisions ### 2.1. Environmental Risk Assessment (Phase I & II ESA) - **URL:** https://www.geopetroleum.com/services/environmental-risk-assessment - **Summary:** Comprehensive environmental due diligence and subsurface investigation for commercial real estate transactions, retail fuel stations, fleet yards, and industrial properties across Texas. - **Capabilities:** 1. **Phase I Environmental Site Assessments (ASTM E1527-21 & EPA 40 CFR Part 312 AAI):** Non-invasive historical aerial review, Sanborn fire insurance maps, regulatory database audits, and visual site reconnaissance to identify Recognized Environmental Conditions (RECs) and qualify buyers/lenders for CERCLA Landowner Liability Protections (LLPs). Standard turnaround: 10–15 business days. 2. **Phase II Environmental Site Assessments (ASTM E1903-19 & TCEQ TRRP 30 TAC Chapter 350):** Intrusive direct-push Geoprobe soil borings, temporary/permanent groundwater monitoring wells, sub-slab soil vapor pins, and accredited laboratory chromatography for VOCs, BTEX (Benzene, Toluene, Ethylbenzene, Xylene), TPH (Total Petroleum Hydrocarbons), PAHs, and heavy metals against Tier 1 Protective Concentration Limits (PCLs). 3. **Phase III Remediation & Corrective Action Plans (CAP):** Contaminated soil excavation, dual-phase vacuum extraction, groundwater plume monitoring, Leaking Petroleum Storage Tank (LPST) closure, and TCEQ regulatory sign-off. 4. **UST & AST Structural Risk Evaluations:** Ultrasonic wall thickness testing, interstitial integrity verification, and corrosion risk audits. ### 2.2. Environmental Compliance Solutions (TCEQ & EPA) - **URL:** https://www.geopetroleum.com/services/environmental-compliance-solutions - **Summary:** Turnkey regulatory compliance testing, permitting, documentation, and Notice of Violation (NOV) mitigation for retail gas stations, commercial fleets, and municipalities under TCEQ Title 30 TAC Chapter 334 and EPA 40 CFR Part 280 / Part 112. - **Mandatory TCEQ Title 30 TAC Chapter 334 Testing Schedule:** | Inspection / Testing Mandate | Governing Statute / Standard | Mandatory Frequency | Operational & Enforcement Impact | | :--- | :--- | :--- | :--- | | Electronic Line Leak Detector (ELLD) | 30 TAC §334.50(b)(2) / PEI RP1200 | Annual (Every 12 months) | Verifies 3.0 GPH leak trip threshold; prevents pressurized pipe releases | | Stage I Vapor Recovery Pressure Decay | 30 TAC §115.221 / CARB TP-201.1 | Annual (Every 12 months) | Prevents VOC emissions during fuel drops; avoids delivery lockouts | | Automatic Tank Gauge (ATG) Recertification | 30 TAC §334.50(e) / EPA 40 CFR §280.43 | Annual (Every 12 months) | Validates magnetostrictive probes, floats, console alarms, and 0.2 GPH leak tests | | Hydrostatic Spill Bucket Testing | 30 TAC §334.48(g) / PEI RP1200 | Triennial (Every 36 months) | Confirms liquid-tight seal of tank fill catchment basins | | Containment Sump Hydrostatic Testing | 30 TAC §334.45(c) / PEI RP1200 | Triennial (Every 36 months) | Confirms STP and under-dispenser containment (UDC) sumps prevent soil leaching | | Cathodic Protection (CP) Survey | 30 TAC §334.49 / NACE SP0285 | Triennial (Sacrificial) / 60-Day Log (Impressed) | Confirms minimum -850 mV structure-to-soil potential to prevent galvanic tank rust | | Routine Walkthrough Inspection | 30 TAC §334.48 / EPA 40 CFR §280.36 | Every 30 Days | Inspects spill buckets for water/debris, checks fill caps, logs passing ATG slips | ### 2.3. Canopy Imaging Solutions - **URL:** https://www.geopetroleum.com/services/canopy-imaging-solutions - **Summary:** Turnkey architectural design, structural steel engineering, custom ACM fascia fabrication, LED forecourt lighting retrofits, and on-site installation for retail fuel stations across Texas and the Southeast. - **Key Specifications:** - **Fascia Cladding:** Kynar 500® / PVDF fluoropolymer-coated Aluminum Composite Material (ACM) meeting ASTM E84 Class A fire rating, AAMA 2605 UV weatherability, and 140+ MPH Texas Gulf Coast hurricane wind-load engineering. - **Forecourt Lighting:** DLC Premium-certified, IP65-rated flush-mount LED canopy luminaires replacing 320W–400W metal halide fixtures, cutting canopy electrical consumption by up to 65% while delivering 30+ foot-candles of uniform forecourt illumination (IESNA RP-33-99). - **Brand Conversions:** Major oil brand reimaging (Shell, ExxonMobil, Chevron, Texaco, Valero, Phillips 66, 76, Sunoco) and custom independent C-store branding. ### 2.4. Custom Fuel Tank Manufacturing (UST & AST) - **Partner Division URL:** https://www.metalproductsusa.com/ - **Summary:** Custom fabrication of UL-certified single-wall and double-wall steel Underground Storage Tanks (USTs) and Aboveground Storage Tanks (ASTs) in Houston, TX. - **UL 142 vs. UL 2085 & STI Flameshield® vs. STI Fireguard® Specification Matrix:** | Specification Attribute | UL 142 Standard AST | UL 2085 Protected AST | STI Flameshield® | STI Fireguard® | | :--- | :--- | :--- | :--- | :--- | | Primary Certification | UL 142 Atmospheric | UL 2085 Protected / Insulated | UL 142 & SwRI 97-04 | UL 2085 & SwRI 93-01 | | Wall Construction | Single or Double-Wall Steel | Double-Wall w/ Insulating Core | Tight-Wrap Double Steel | Double Steel w/ Lightweight Porous Concrete | | Thermal Fire Resistance | None | 2-Hour 2,000°F Furnace Test | 2-Hour Fire Exposure | 2-Hour 2,000°F Furnace Test (75% less heat transfer) | | Ballistic & Impact Rating | None | .30-06 Ballistic & 12,000 lb Vehicle Impact | Fire Endurance Only | .30-06 Ballistic & 12,000 lb Vehicle Impact | | Exterior Concrete Dike Required? | Yes (unless double-wall w/ setback) | No secondary dike required | Subject to local AHJ | No exterior concrete dike required | | Typical Capacity Range | 300 – 50,000 Gallons | 500 – 30,000 Gallons | 300 – 25,000 Gallons | 500 – 30,000 Gallons | --- ## 3. Complete Technical Glossary (14 Core Terms) 1. **UST vs. AST (Storage Tank Comparison):** Underground Storage Tanks (USTs) store fuel sub-surface to preserve forecourt real estate under TCEQ TAC 334. Aboveground Storage Tanks (ASTs) sit on surface slabs with lower installation CapEx and visual inspection under EPA SPCC rules (40 CFR Part 112). 2. **Underground Storage Tank (UST):** A tank and connected underground piping system with at least 10% of its combined volume below ground. Regulated under TCEQ Title 30 TAC Chapter 334 and EPA 40 CFR Part 280; requires double-wall containment, ATG monitoring, and certified Class A/B/C operators. 3. **Aboveground Storage Tank (AST):** Stationary surface-mounted atmospheric vessel for bulk fuel or chemical storage built to UL 142 or UL 2085, NFPA 30/30A, and STI SP001 standards. 4. **TCEQ Title 30 TAC Chapter 334:** Primary Texas state regulatory code governing registration, secondary containment, release detection, operator training, financial assurance, and closure of USTs and ASTs. 5. **Spill Prevention, Control, and Countermeasure (SPCC) Plan:** Mandatory EPA document (40 CFR Part 112) for facilities storing >1,320 gallons of aggregate aboveground oil/fuel; requires PE certification every 5 years and 110% secondary containment volume. 6. **UL 142 vs. UL 2085:** UL 142 covers atmospheric steel tanks without thermal insulation; UL 2085 covers insulated protected tanks passing 2-hour 2,000°F fire, bullet, and vehicle impact tests. 7. **Fireguard® vs. Flameshield®:** STI Fireguard® uses porous concrete insulation between double steel walls to meet UL 2085; STI Flameshield® uses tight-wrap double steel walls meeting SwRI 97-04 2-hour fire endurance. 8. **Phase I Environmental Site Assessment (Phase I ESA):** Non-invasive historical and visual investigation under ASTM E1527-21 and EPA AAI (40 CFR Part 312) to identify Recognized Environmental Conditions (RECs). 9. **Phase II Environmental Site Assessment (Phase II ESA):** Intrusive subsurface soil, soil vapor, and groundwater sampling under ASTM E1903-19 and TCEQ TRRP (30 TAC Chapter 350) to confirm and delineate contamination plumes. 10. **Recognized Environmental Condition (REC):** Presence or likely presence of hazardous substances or petroleum products in subsurface media due to a historical or active release (ASTM E1527-21). 11. **Stage I Vapor Recovery:** Closed-loop coaxial/dual-point vapor capture system returning displaced gasoline vapors from USTs to the delivery tanker truck during fuel drops; requires annual pressure decay testing under 30 TAC Chapter 115. 12. **Stage II Vapor Recovery & Decommissioning:** Dispenser-level vapor recovery system largely decommissioned in Texas under 30 TAC §115.241 and PEI RP500 due to modern vehicle Onboard Refueling Vapor Recovery (ORVR). 13. **Automatic Tank Gauge (ATG):** Digital console (e.g., Veeder-Root TLS-450PLUS) and tank probe system executing automated 0.2 GPH monthly leak tests, water ingress monitoring, and sump sensor alarms. 14. **Notice of Violation (NOV):** Formal TCEQ/EPA administrative enforcement citation requiring corrective remediation within 30–60 days to avoid penalties exceeding $10,000/day or fuel delivery lockouts. 15. **Hydrostatic Sump & Spill Bucket Testing:** Triennial liquid-level integrity testing under PEI RP1200 and 30 TAC §334.48 to verify spill buckets and containment sumps are liquid-tight. 16. **Cathodic Protection (CP):** Sacrificial anode or Impressed Current (ICCP) electrochemical corrosion protection for underground steel components (NACE SP0285, 30 TAC §334.49). 17. **Aluminum Composite Material (ACM Fascia):** Class A fire-rated aluminum composite cladding panels coated with Kynar 500® PVDF for durable, hurricane-rated gas station canopy fascia. 18. **Commercial LED Canopy Retrofit:** Replacement of legacy 320W–400W metal halide fixtures with IP65 flush-mount LED luminaires, cutting canopy electricity usage by up to 65%.